Staff Track Design

Drawings done right.
Delivered fast.

As-installed drawings, shop drawings, block plans and evacuation plans — drawn in CAD from your markups and site photos, and issued as PDF and DWG with every revision tracked.

Send what you have. We draw the rest.
📐 Drawing register
Issued today
📐
Fire alarm — as-installed, Level 2
Rev B · from site markups · PDF + DWG
✓ Issued
🧩
Shop drawing — containment run
Plant room · dimensioned for fabrication
In progress
🗺️
Block plan — main entrance panel
Zones, isolation points, key hazards
✓ Issued
🚪
Evacuation plans — 4 floors
'You are here' per lobby · print-ready
For review
Your markups in → issued drawings outPDF + DWG
PDF + DWG
Every set, both formats
Rev A → Z
Revisions tracked, never overwritten
Your titleblock
Your numbering, your standard
IE · UK · AU
Drawn for local fire officers
What we draw

Four drawings every site needs

From the panel to the fire log book to the handover pack — the sets a contractor is asked for again and again, drawn once and drawn properly.

📐

As-installed drawings

The record of what's actually on the wall. We take your site markups, photos and the original design and produce the as-installed set — device locations, cable routes, zones and panel details — ready for handover, the O&M manual and the next engineer who walks in.

  • Fire alarm, intruder, CCTV, access control & electrical
  • Drawn from your red-pen markups or site photos
  • Issued as PDF + DWG with a revision block
For handover & O&M
🧩

Shop drawings

Fabrication-ready detail for the workshop and the site. Ductwork, containment, pipework, panel layouts and brackets — dimensioned, coordinated with the design drawings and drawn to your standard.

  • Dimensioned to fabricate from
  • Coordinated with the consultant's drawings
  • Your titleblock and drawing numbers
For fabrication & install
🗺️

Block plans

The single-sheet plan a fire officer or panel engineer reads first — building outline, zones, panel and repeater positions, isolation points and key hazards, mounted at the panel and kept in the log book.

  • Zone plans at the panel
  • Utility isolation & key points marked
  • Sized for the frame, print-ready
For the panel & the fire log book
🚪

Evacuation plans

Clear 'You are here' plans for every floor — exits, assembly points, refuge areas, fire equipment and the route out, drawn with standard safety symbols to be read in seconds.

  • Per floor, per orientation
  • Exits, assembly points & refuges
  • Print-ready at the size the sign needs
For every floor and lobby

Any input works. Red-pen markups, site photos, a sketch on a job sheet, an old DWG or PDF.

Checked before it's issued. You see it first, mark it up, and we revise it — then it goes out.

Filed to the job. Use Staff Track? The issued set lands on the site, in the app, for the next engineer.

How it works

Send it. We draw it. You issue it.

No CAD seat, no drawing office, no evenings lost to a plan that has to go out tomorrow.

Send us what you have

Red-pen markups, site photos, a sketch on the back of a job sheet, an old DWG or PDF. Tell us what it's for and where it's going — the panel, the log book, the handover pack, the sign on the wall.

We draw it

Drawn in CAD to your titleblock and drawing numbers, coordinated with the design drawings where there are any, and sent back to you for a check before anything is issued.

Issued and filed

You get PDF and DWG with a revision block. If you run your jobs on Staff Track, the issued set is filed against the job and the site, so it's in the app for whoever is on that address next.

Fire & security

Drawings a fire officer can read.

Block plans at the panel, evacuation plans on every floor and an as-installed set in the handover pack — the paperwork an inspection asks for, drawn so it answers the question at a glance.

  • Block plans and zone plans mounted at the panel
  • Evacuation plans per floor, per orientation
  • As-installed sets for handover and O&M
  • Every revision tracked — nothing overwritten, nothing lost
🗂️ Site documents
Up to date
🗺️
Block plan — Rev A
1 sheet · at the panel
Issued
🚪
Evacuation plans — 4 floors
8 sheets · one per lobby
Issued
📐
As-installed — fire alarm
Rev C · from this week's markups
For review
🧩
Shop drawing — containment
Plant room · dimensioned
In progress

Got a drawing that has to go out?

Send us the markups. We'll do the rest.

Get a quote