IndustrialCaliforniaClosing soon
Palo Alto Tech Campus Phase 3 — Plumbing
Posted by Sunridge Build Group LLC
LocationEl Camino Real, Palo Alto CA 94301, California
Project TypeIndustrial
Value Range€1M–€5M
Closing Date31 Jul 2026
Packages1 trade package
Interests0 registered
Project Description
Plumbing and process piping for Phase 3 of a tech campus expansion in Palo Alto. Includes lab-grade purified water systems, domestic services, site drainage, cooling tower make-up and chemical waste neutralisation.
Trade Packages (1)
1
Plumbing
Closes: 31 Jul 2026
Plumbing works as outlined in the tender specification.
Documents (0)
No documents have been uploaded for this tender.
Interested in this tender?
Let the builder know you are interested and they will be in touch with next steps.
New to Staff Track Tenders?
Sign up to quote on this tender
Create an account to download drawings, message the builder and submit your quote.
Already have a Tenders account? Sign in →
Builder Details
Sunridge Build Group LLC
Contact: Ashley Cortez